Sunday closures for Bridge Pedal

Credit: bridgepedal.com

Sunday closures for Bridge Pedal

Print
Email
|

by Jeff Thompson, KGW.com Staff

kgw.com

Posted on August 11, 2011 at 3:12 PM

Updated Sunday, Aug 14 at 11:35 AM

Poll:
For Portlanders, Bridge Pedal is...

PORTLAND -- Several Portland bridges are closed to vehicular traffic this morning for the 16th Annual Providence Bridge Pedal.

Click here for live traffic alerts

The event is expected to draw thousands of cyclists for a tour of ten Portland bridges.

The Morrison Bridge will remain open during the event, though construction may slow traffic a bit.

Traffic on the St. John's Bridge will be down to lane lane in either direction from 7 until 11 a.m.

The eastbound lanes of the Broadway Bridge will be closed from 6:45 until 11:30 a.m.

The westbound lanes of the Burnside Bridge will be closed from 6:45 until 11 a.m.

The top deck of the Fremont Bridge--I-405 southbound--will be closed from 6 a.m. until noon; the bottom deck will remain open.

Click for a complete map of the Providence Bridge Pedal route

The eastbound lanes of the Hawthorne Bridge will be closed from 6 until 10 a.m.

The top deck of the Marquam Bridge--I-5 northbound--will be closed from 5:30 until 11 a.m.

The Ross Island Bridge will be closed to westbound traffic from 5:30 until 10:30 a.m.

The westbound lanes of the Sellwood Bridge will be closed from 5:30 until 9 a.m.

The eastbound lanes of the Steel Bridge will be closed from 6:45 until 10 a.m.; the MAX will still operate on the bridge in both directions.

SW Salmon Street will also be closed SW 14th Avenue to SW 18th Avenue from 5 a.m. until 3 p.m.

Download the Portland Traffic mobile app

Print
Email
|